e.on signage system
headquarters
münchen 2004

the five levels of the building are each assigned their own river. places and landscapes, songs and poems endow the rivers with visible form. anonymity adieu: each workplaces takes on its own character, defined by an imaginary river and the tinted light donated by the coloured stripes. the walls are covered with a silvery web, its graphic forms reflecting the ripples, whirls and splashes of water patterned by currents, wind and rain. 

projectdata

client:  

e.on energie ag 

 

architect:  

albert speer & partner 

www.as-p.de 

 

interior design:  

büro für gestaltung  

diane ziegler 

www.zieglerbuerg.de 

 

project team:  

frank geiger  

(project manager) 

beate gerner 

andreas uebele 

 

photos: 

andreas körner 

www.a-koerner.de 

awards

chicago athenaeum:  

museum of architecture  

and design, 2004  

good design award 

 

german design prize 2006 nominated 

 

joseph binder award, auszeichnung